
Development
SOLD OUT
Partickhill Road, Hyndland
A magnificent detached Grade B listed property situated in the heart of Glasgow’s thriving West End.
Redevelopment
A unique conversion of four spacious
4 apartment flats respecting the original architectural heritage. All apartments have the benefit of Private Car Parking and electric vehicle charge points.
Property notes
Originally Constructed: 1867
Anticipated Redevelopment Completion: Dec ‘20
Property Availability: SOLD OUT
Price Range: From £695,000
Nearest Train Station: Hyndland (6 min. walk)
Nearest Subway: Hillhead (10 min. walk)
Schools: 5, mixed (within 2 sq. miles)
Kitchens
Designed by Kitchens International, the culinary centrepiece has been specially developed for each of the 4 properties.
High quality specifications throughout
Kitchen / Utility Room
Designer Leicht kitchen by ‘Kitchens International’ incorporating a central island dining unit, Silestone worktops and Siemens appliances.
Utility room with separate free-standing washing machine and tumble drier.
Bathroom
Exclusive bathroom by ‘Scope’ with Laufen wall hung concealed cistern wc, and double vanity unit, walk in shower and carronited semi free-standing bath all fitted with Vado Chrome brassware, Milano Lustro anthracite towel rail, tiled floor with underfloor heating.
En-Suite
Exclusive ensuites by ‘Scope’ with Laufen wall hung concealed cistern wc, and vanity unit, walk in shower (master) all fitted with Vado Chrome brassware, Milano Lustro anthracite towel rail, tiled floor with underfloor heating.
Choice of ‘Porcelanosa’ tiles throughout.
Doors & Finishes
Bespoke raised and fielded panel internal doors and period entrance door with polished chrome ironmongery, detailed architraves, and matching skirtings. Polished chrome light switches, sockets, downlights and pendants.
Central Heating
Gas-fired central heating with award winning high efficiency Worcester Greenstar 8000 condensing boiler and Milano Aruba, and Windsor anthracite radiators and traditional period fireplaces with gas coal fires.
Flooring & Decoration
Hardwood flooring to hall, lounge, and kitchen with carpets to all bedrooms. Communal entrance hallway and staircase with wall lights, feature centre chandelier, designer wallpaper, and quality carpets throughout.
Basement & Gardens
Extensive semi-basement area with one locked storage room per apartment – bin store, cycle store and services cupboard.
Gardens & Driveway
Professionally landscaped gardens and driveway with private allocated parking and individual Project EV electric charging points.
Security & Factors
Video door entry system with Wi-Fi extension. Property professionally factored by Hacking and Paterson.
Floor plans
Ground Floor
First Floor
Note: Click to enlarge.
Updated 22nd July 2020
Room sizes
Approximate total size: 1,700 sq. ft
METRES
Lounge: 5.85m x 5.00m
Kitchen: 4.55m x 4.05m
Master Bedroom: 6.25m x 4.60m
Ensuite: 2.55m x 2.10m
Bedroom 2: 4.50m x 3.50m
Ensuite: 2.70m x 1.45m
Bedroom 3: 4.15m x 3.55m
Bathroom: 3.55m x 3.40m
Utility: 1.80m x 1.45m
Hall: 8.15m x 2.10m
FEET/INCHES
Lounge: 19′2.3” x 16′4.85”
Kitchen: 14′11” x 13′3.45”
Master Bedroom: 20′6” x 15′1.1”
Ensuite: 8′4.39” x 6′10.68”
Bed 2: 14′9.17” x 11′5.8”
Ensuite: 8′10.3” x 4′9.09”
Bedroom 3: 13′7.39” x 11′7.76”
Bathroom: 11′7.76” x 11′1.86”
Utility: 5′10.87” x 4′9.09”
Hall: 26′8.87” x 6′10.68”
A timeless property with modern tricks.
Project EV charging points for all apartments.
Standard Connection
OCPP v1.6 standard open communication protocol, IEC 62196 type II connector.
Energy Timeshifting
Timeshift your charging schedule to meet the lowest cost tariff times.
Intelligent Monitoring
Use the Project EV app for Android and iOS devices to manage energy utilisation,
All connectors have a maximum of 7.3KW output at 32A and are wall mounted with lightning and overcharge protection. 3-year warranty included with all chargers and they are 18th addition compliant. For further information, please contact our sales office - details here.
Property location
Appointments
Due to the current measures in social distancing, sales office meetings will be strictly on a one-by-one basis. Please use the contact form and we will respond to you as soon as possible. Thank you for your understanding. If this process changes, we will update the page information accordingly.
Completion
The property was completed at the end of 2020, with residents starting to move in just prior to Christmas.